Florida Can Manufacturing

Our design team is versatile.

Construction of a $120 million, advanced-manufacturing plant for aluminum cans.

Phase 1 will include about 300,000 square feet, scheduled to open in the third quarter of 2021; final buildout is projected between 800,000 and 1 million square feet

Shine Ocoee Vermeer Trinity

Two buildings proposed, the first with 8,000 square feet of office/retail and 11,723 square feet for equipment storage warehouse; the second, a 45,416 square foot combined showroom/warehouse, at 416 Ocoee Apopka Road

Top Gun All Stars Orlando

Stephens Barrios Engineering recently completed a collaborative effort with Keator Construction to design and build the 36,000 square foot Top Gun All Stars Orlando recreational facility.  Completed in 2019, the state-of-the-art cheerleading and gymnastics facility services the entire Orlando area supporting the growing sports of cheerleading and gymnastics.

Family Dollar Store

SBE developed and engineered an 8,500 SF Family Dollar Store in Gainesville, Florida.  Our team was given a beautification award from the City for making special accommodations to save a specimen live oak tree on the property as part of the project.